84
AI-49
S20 X8
1 x
Roof Pull 5/8 x 3 x 13 1/16”
Wood Parts
9578
Hardware
8 x
#8 x 1-3/8” Wood Screw
S20
9578
S20
Fig. 35.1
Flush
Step 35: Attach Roof Pull
Part 1
A:
Position (9578) Rope Pull between the 2 (9567) Fence Board Long A’s making sure that it’s flush to the top of
(9559) Roof Tie. Attach using 8 (S20) #8 x 1- 3/8” Wood Screws. (fig. 35.1)