![KidKraft Cedar Summit F29080 Installation And Operating Instructions Manual Download Page 26](http://html1.mh-extra.com/html/kidkraft/cedar-summit-f29080/cedar-summit-f29080_installation-and-operating-instructions-manual_1965921026.webp)
AI-6
S7 X8
26
2 x
Floor Joist 1-1/4 x 3 x 28-1/8”
Wood Parts
Hardware
9537
8 x
#12 x 2” Pan Screw
Step 5: Join the Frame Assemblies
Part 1
S7
Fig. 5.2
Fig. 5.1
9537
Flush
x 2
x 4 per board
S7
A:
Place 1 (9537) Floor Joist along the bottom of the front and back side walls so they are centered over the
seams where the panels join together and are flush to the bottom of each panel. Check to make sure the (9537)
Floor Joists are level then attach each joist using 4 (S7) #12 x 2” Pan Screws per board. (fig. 5.1 & 5.2)
9286
9287
Front Panel
Assembly
Back Panel
Assembly
AI-6
S7 X8
9537