![KidKraft Cedar Summit F29080 Installation And Operating Instructions Manual Download Page 21](http://html1.mh-extra.com/html/kidkraft/cedar-summit-f29080/cedar-summit-f29080_installation-and-operating-instructions-manual_1965921021.webp)
21
1 x
Left Access 1 3/8 x 2 1/2 x 57 53/64”
1 x
Right Access 1 3/8 x 2 1/2 x 57 53/64”
4 x
Tread 15/16 x 3 1/4 x 16 3/16”
9545
9055
9054
Fig. 2.1
Fig. 2.3
Wood Parts
Hardware
Step 2: Access Ladder/Rope Wall Assembly
Part 1
16 x
#8 x 2-1/2” Wood Screw
S3
Fig. 2.2
End View
Flush to edges
Top Edge of Access Rail
S3
9054
9545
AI-1
S3 X16
AI-1
S3 X16
AI-1
S3 X16
9055
9545
S3
S3
A:
Place (9054) Left Access on one side of 4 (9545) Treads and (9055) Right Access on the other side with the
grooves facing in. (fig. 2.1)
B:
Fit each (9545) Tread into grooves on both (9054) and (9055) Access rails, make sure the top edge of the
(9545) Treads are flush to the front of the Access rails. (fig. 2.1 and 2.2)
C:
Pre-drill pilot holes with a 1/8” drill bit and attach rails and treads together using 4 (S3) #8 x 2-1/2” Wood
Screws per tread. (fig. 2.1, 2.3)