36
access board must be removed first
AI-14
S20 X4
Hardware
4 x
#12 x 2” Pan Screw
S7
9543
9058
9546
9055
S7
x 4
Step 11: Attach Access Ladder/Rockwall Assembly
Part 2
Fig. 11.2
B:
Place (9546) Access Board Top from Step 3, Part 1 against (9055) Right Access and (9058) Rope Rail and
flush to the top, Pre drill holes using a 1/8” Drill Bit then attach with 4 (S7) #12 x 2” Pan Screws. (fig. 11.2)