60
AI-30
WB8 X5(FW2 TN2)
S11 X1
S4 X4
S3 X4
AI-30
WB8 X5(FW2 TN2)
S11 X1
S4 X4
S3 X4
AI-30
WB8 X5(FW2 TN2)
S11 X1
S4 X4
S3 X4
9287
9560
9560
9561
9562
9562
S11
S3
S3
5 x
5/16 x 2-3/8” Wafer Bolt
(5/16” flat washer, 5/16” t-nut)
WB8
Hardware
Wood Parts
1 x
Terrace support left 1 x 2 3/8 x 47 3/4”
1 x
Terrace support Right 1 x 2 3/8 x 47 3/4”
1 x
Mid Joist 1 x 2 3/8 x 33 11/16”
9560
9561
9562
4 x
#8 x 2-1/2” Wood Screw
1 x
#8 x 2” Wood Screw
S3
S11
WB8
5/16” Flat
Washer
5/16”
T-Nut
9286
9561
Fig. 23.2
Fig. 23.3
5/8”
A:
Place (9561) Terrace Support Right and (9560) Terrace Support Left on either side of (9562) Mid Joist, taking
note of the hole orientation. Line (9562) Mid Joist up with the pre-drilled holes in each Terrace Support and attach
using 2 (S3) #8 x 2 -1/2” Wood Screws per side. (Fig. 23.1 & 23.2)
B:
From inside the assembly measure 5/8” (15.9mm) down from the top of the Wall Panels and place the Terrace
Support Assembly so that the (9560) Terrace Support Left and (9561) Terrace Support Right are tight to the (9553)
Supports. (Fig. 23.1 & 23.3)
C:
From inside, loosely install 2 (WB8) 5/16 x 2 -3/8” Wafer Bolts (with flat washer and t-nut) into (9560) Terrace
Support Left and 3 (WB8) 5/16 x 2 -3/8” Wafer Bolts (with flat washer and t-nut) into (9561) Terrace Support Right.
Check to make sure the Terrace Support Assembly is level, then tighten the Wafer Bolts. (Fig. 23.1 & 23.3)
D:
Install 1 (S11) #8 x 2” Wood Screw into the end of (9560) Terrace Support Left as shown in fig. 23.1
Step 23: Attach Terrace Assembly
Part 1
Fig. 23.1