50
Hardware
12 x
5/16 x 6-1/8” Hex Bolt
(5/16” flat washer x 2, 5/16” lock nut & plastic formed washer)
1 x
5/16 x 3” Wafer Bolt
(5/16” flat washer, 5/16” t-nut)
4 x
#7 x 1-1/8” Pan Screw
Other Parts
6 x Heavy Duty Swing Hangers
6 x Spring Loaded Quick Link
1 x Cedar Summit by KidKraft
Plaque
Wood Parts
1 x Engineered SW Beam 3 x 5 1/4 x 92”
Step 17: Swing Beam Assembly
Part 1
A:
Attach 6 Heavy Duty Swing Hangers to (9049) Engineered SW Beam using 2 (G13) 5/16 x 6-1/8” Hex Bolt
(with 2 flat washers, plastic formed washer and lock nut) per swing hanger, as shown in fig. 17.1 and 17.2.
B:
Attach 1 Spring Loaded Quick Link to each Heavy Duty Swing Hanger. (fig. 17.3)
C:
Install 1 (WB7) 5/16 x 3” Wafer Bolt (with flat washer and t-nut) in the middle bolt hole, from the bottom
up, in (171) Engineered SW Beam as shown in fig. 17.1 and 17.4.
IT IS IMPORTANT THAT THIS BOLT IS
ATTACHED. IT WILL MINIMIZE CHECKING OF WOOD.
D:
Attach Cedar Summit by KidKraft Plaque to centre of (9049) Engineered SW Beam (over top of t-nut) using
4 (S38) #7 x 1-1/8” Pan Screws. (fig. 17.5)
9049
Fig. 17.3
9049
Fig. 17.1
Fig. 17.2
Fig. 17.5
5/16” Flat
Washer
Heavy Duty
Swing Hanger x 6
5/16” Flat
Washer
5/16”
T-Nut
Swing End
Fort End
S38
x 4
5/16”
Lock Nut
Cedar Summit
Plaque
9049
9049
5/16” Flat
Washer
Plastic
Formed
Washer
Heavy Duty
Swing Hanger
Heavy Duty
Swing Hanger
G13
G13
WB7
Spring
Loaded
Quick Link
9049
Fig. 17.4
WB7
Caution: The Spring Loaded Quick Link
must be attached to the Heavy Duty Swing
Hanger in the closed position. (fig. 17.4)
Spring Loaded Quick
Link in the closed
position
S38