3
Front-Panel Operation
74
Keysight E3633A and E3634A User’s Guide
System-Related Operations
This section gives information on topics such as self-test, error conditions, and
front-panel display control. This information is not directly related to setting up
the power supply but is an important part of operating the power supply.
Self-test
A
power-on
self-test occurs automatically when you turn on the power supply.
This test assures you that the power supply is operational. This test does not
perform the extensive set of tests that are included as part of the complete
self-test described below. If the power-on self-test fails, the
ERROR
annunciator
turns on.
– A
complete
self-test performs a series of tests and takes approximately 2
seconds to execute. If all tests pass, you can have a high confidence that
the power supply is operational.
– If the
complete
self-test is successful, “PASS” is displayed on the front
panel. If the self-test fails, “FAIL” is displayed and the
ERROR
annunciator
turns on. See the
Service Guide
for instructions on returning the power
supply to Keysight Technologies for service.
– Front-panel operation:
To perform the complete front panel
self-test
, hold down the
key as you
turn on the power supply and
hold down
the key
until you hear a long beep
.
The self-test will begin when you release the key following the beep.
–
Remote interface operation:
Returns “0” if the complete self-test passes or “1” if it fails.
*TST?
Summary of Contents for E3633A
Page 1: ...Keysight E3633A and E3634A DC Power Supplies User s Guide ...
Page 10: ...10 Keysight E3633A and E3634A User s Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...
Page 18: ...18 Keysight E3633A and E3634A User s Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...
Page 20: ...20 Keysight E3633A and E3634A User s Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...
Page 133: ...Remote Interface Reference 4 Keysight E3633A and E3634A User s Guide 133 SCPI Status System ...