3-8
Routine Maintenance
Replacing non-volatile RAM battery
The Model 2700 has a three year battery for non-volatile RAM. Use the procedure below to
replace the battery, if required. Refer to the disassembly procedures in Section 5 and the parts
list and component layout drawings at the end of Section 6 for more information.
WARNING
The following procedure is intended only for qualified service personnel.
Do not perform this procedure unless you are qualified to do so.
Disconnect the line cord and all connecting wires from the Model 2700
before removing the top cover.
1.
Before replacing the battery, refer to the troubleshooting procedures in Table 4-4 in
Section 4 to determine if the battery requires replacement
2.
Remove the Model 2700 top cover using the disassembly procedures in Section 5.
3.
Locate battery BT100 using the motherboard component layout drawing at the end of
Section 6.
4.
De-solder the battery from the top side of the circuit board.
5.
Install a new battery, Keithley part number BA-51, taking care to observe proper
polarity.
6.
Solder the battery connection to the circuit board using organic (OA-based) flux solder.
7.
After soldering, remove all flux using a foam-tipped swab or brush dipped in pure
water. Blow dry the board with dry nitrogen gas, then allow the board to dry for several
hours in a 50˚C, low-humidity environment before use.
8.
Re-install the top cover by following the disassembly procedures in Section 5 in reverse
order.
Summary of Contents for 2700
Page 1: ...Contains Servicing Information Model 2700 Multimeter DataAcquisition System Service Manual...
Page 16: ......
Page 17: ...1 PerformanceVeri cation...
Page 48: ...1 32 Performance Verification...
Page 49: ...2 Calibration...
Page 72: ...2 24 Calibration...
Page 73: ...3 RoutineMaintenance...
Page 81: ...4 Troubleshooting...
Page 99: ...5 Disassembly...
Page 106: ...5 8 Disassembly...
Page 107: ...6 ReplaceableParts...
Page 121: ...A Speci cations...
Page 136: ...A 16 Specifications...
Page 137: ...B CalibrationReference...
Page 161: ...C CalibrationProgram Appendix C Page 1 Friday February 18 2000 7 45 AM...
Page 172: ...Service fm Page 2 Friday February 18 2000 7 44 AM...
Page 173: ......
Page 174: ...Keithley Instruments Inc 28775 Aurora Road Cleveland Ohio 44139 Printed in the U S A...