DS Series PBX Technical Reference And Installation Guide
129
XII. MECHANICAL INSTALLATION OF THE
SYSTEM
First of all, the technical team that is to perform the installation is supposed to make sure the
following pieces of installation equipment are entirely available:
1) Drill (number 8 chuck)
2) Number 8 plastic anchor plugs (plenty)
3) Appropriate wood screws and washers
4) Cutter pliers
5) Thin star tip screwdriver
6) Thick star tip screwdriver
7) Thin flat tip screwdriver
8) Thick flat tip screwdriver
9) Pliers
10) RJ45 and RJ11 pliers
11) RJ11 and RJ45 connectors (at least 10 items each)
12) 220 V extension cord (with a power strip with at least three outlets)
13) A laptop PC with a serial port and Ethernet connection
Summary of Contents for DS200
Page 1: ...11 2010 TECHNICAL REFERENCE AND INSTALLATION GUIDE PBX DS SERIES...
Page 2: ...DS SERIES PBX TECHNICAL REFERENCE AND INSTALLATION GUIDE NOVEMBER 2010...
Page 17: ...DS Series PBX Technical Reference And Installation Guide 7...
Page 69: ...DS Series PBX Technical Reference And Installation Guide 59...
Page 80: ...70...
Page 222: ...11 2010...