124
XI.2. UNPACKING AND CHECKING THE SYSTEM
PARTS
Upon the time for installation, when the delivered products arrive at the location of the
installation, the technical personnel that will perform the operation should count the delivered
items, together with a representative assigned by the customer, and check whether the parts
are intact or not.
Should the delivered items have defects, i.e., they have been bent, scratched or broken, etc.,
and/or should some parts are missing or wrong items have been delivered, an official report
must be prepared at once and problems should be recorded to that report in detail. Damaged
parts and their packages should be photographed, if possible.
Temperature of the location where the incoming parts are to be stored until the installation
ought to be in the range –10...+50
o
C.
XI.2.A. PARTS LIST
The units that come with the exchanges of the DS200 series are listed below. Upon opening
the packages, the delivered items must be compared with the parts list below, and in case
there is anything missing, it must be made up.
XI.2.A.1. DS200 MAIN RACK
DS200 Metal Chassis
BPL200-MAIN backplane
BPL200-SPS backplane
CPU200 card
UTIL200 card
CPKON200 card
DS200 CPU-FC CPU flat cable
SPS248 power supply
SPS200 power supply
Card covers (8 items)
220 V 90
o
power cord
PC connection cable
DS200 KTS system cable
CD-ROM (Idea, KNE, guides)
Summary of Contents for DS200
Page 1: ...11 2010 TECHNICAL REFERENCE AND INSTALLATION GUIDE PBX DS SERIES...
Page 2: ...DS SERIES PBX TECHNICAL REFERENCE AND INSTALLATION GUIDE NOVEMBER 2010...
Page 17: ...DS Series PBX Technical Reference And Installation Guide 7...
Page 69: ...DS Series PBX Technical Reference And Installation Guide 59...
Page 80: ...70...
Page 222: ...11 2010...