-
12
Before the onset of the frost period,
maintenance tasks must be carried out
"every year before the onset of the forst
period" according to section "Mainte-
nance and Care".
Carry out the following tasks for keep-
ing the frost protection intact.
NOTICE
Maintenance not being done on time or
from experts will mean, that there is no
guarantee concerning frost damage.
1 Filter for frost-protection pump
Turn the main switch to position "0"
Turn the main switch to position "1".
Lock the operating time at the control.
If the equipment is to be shut down, and
there is not danger of frost,
disconnect the water input,
disconnect the power supply.
The following measures must be performed
if the machine room is not kept frost-free.
Screw off water supply hose and high
pressure hose.
Remove the RO membrane and store it
under anti-freezing conditions.
Empty all swimmer containers; unscrew
the hoses and let the water drain off.
Empty the permeate buffer tank.
Disconnect the water pipe between
base exchanger and swimmer tank for
warm water.
Rinse the plant (without base exchang-
er) with an anti-frost solution.
Rinse the base exchanger with concen-
trated salt solution.
Blow out all water-carrying parts with
oil-free compressed air.
NOTICE
Decommission the heater provided by the
customer in accordance with the separate
operating instructions of the heater.
NOTICE
All parts of the plant except the base ex-
changer must be rinsed with anti-frost solu-
tion during longer operational breaks to
prevent the system against corrosion.
In case of doubt, call Customer Service to
carry out the shutdown operations.
Maintenance jobs before and during the frost period
Time
Activity
Assembly affected
Performance
By whom
many times
daily
opinion
Washing brush
Check for dirt and ice formation; lock foam wash if needed.
Operator
daily
opinion
Heated foam hoses
Are the hoses warm?
Operator
weekly
opinion
Filter for frost-protection
pump
Check filter for soiling and reinsert
Operator
monthly
Clean the
filter
Filter for frost-protection
pump
Clean the filter and replace
Operator
monthly or af-
ter 200 operat-
ing hours;
more frequent-
ly if needed
opinion
Quantity of frost water pro-
tection in the frost protec-
tion circuit
Target value: approx. 0.5 l/min per washing tool
Water quantity is higher: Change the node piece in the hand-spray
gun.
몇
WARNING
Risk of injury and damage. If the frost protection water volume is big-
ger than the admissible value, the cleaning tool may move uncontrol-
lably due to the exiting water stream. If the frost protection water vol-
ume is too big, replace the union piece in the trigger gun by all
means.
Water quantity smaller: Clean the filter of the anti-freeze pump, clean
sieve in the orifice plate (see "Maintenance work"), flush line, check
direction of rotation of the pump.
Operator
Shutting down
Shutdown during Frost Conditions
Shutdown
Shutdown during frost period
49
EN
Summary of Contents for SB MU
Page 1: ...SB MU 59661150 08 18 Deutsch 3 English 38 Fran ais 74 Espa ol 111 Svenska 149 187 Polski 233...
Page 2: ...2...
Page 9: ...7 1 Menuepunkt 2 Parameter 9 DE...
Page 15: ...13 Funktion Flie schema 2 Werkzeug Ausf hrung 15 DE...
Page 16: ...14 Flie schema 1 Werkzeug Ausf hrung 16 DE...
Page 21: ...19 21 DE...
Page 44: ...7 1 Menu item 2 Parameter 44 EN...
Page 50: ...13 Function Flow chart 2 tool design 50 EN...
Page 51: ...14 Flow chart 1 tool design 51 EN...
Page 56: ...19 56 EN...
Page 80: ...7 1 Rubrique de menu 2 Param tre 80 FR...
Page 87: ...14 Fonction Sch ma de flux ex cution 2 outils 87 FR...
Page 88: ...15 Sch ma de flux ex cution 1 outils 88 FR...
Page 93: ...20 93 FR...
Page 117: ...7 1 Punto del men 2 Par metros 117 ES...
Page 124: ...14 Funci n Esquema de flujo modelo con 2 herramientas 124 ES...
Page 125: ...15 Esquema de flujo modelo con 1 herramienta 125 ES...
Page 130: ...20 130 ES...
Page 155: ...7 1 Menypunkt 2 Parameter 155 SV...
Page 156: ...8 1 Menypunkt 2 Parameter 156 SV...
Page 163: ...15 Funktion Fl desschema 2 verktygs utf rande 163 SV...
Page 164: ...16 Fl desschema 1 verktygs utf rande 164 SV...
Page 169: ...21 169 SV...
Page 170: ...22 170 SV...
Page 188: ...2 65 4 20 C 188 RU...
Page 189: ...3 STOP 30 50 80 80 30 30 10 1 2 3 1 2 3 4 5 STOP 1 2 189 RU...
Page 190: ...4 1 2 3 4 5 6 7 8 9 10 WSO 11 1 1 2 3 0 4 0 5 4 5 1 0 Superfox 190 RU...
Page 193: ...7 OK 2 M1 M2 P1002 OK P1004 193 RU...
Page 194: ...8 1 2 194 RU...
Page 195: ...9 1 2 195 RU...
Page 198: ...12 K RCHER K RCHER 1 1 1 1 2 3 100 1 RM 806 RM 812 RM 837 RM 820 RM 821 RM 801 198 RU...
Page 202: ...16 1 0 1 RO 200 0 5 202 RU...
Page 203: ...17 2 203 RU...
Page 204: ...18 1 204 RU...
Page 208: ...22 1 1 1 1 1 1 1 2 3 1 2 OK 2 M144 208 RU...
Page 209: ...23 209 RU...
Page 210: ...24 210 RU...
Page 213: ...27 M251 M234 M237 X M235 M236 XX M232 M238 M239 M240 M241 M242 XXX SB C M243 SB C 213 RU...
Page 214: ...28 K rcher K RCHER 50 C 214 RU...
Page 215: ...29 0 5 1 2 C 0 5 0 0 8 2 WZ 215 RU...
Page 216: ...30 0 5 40 3 MIN MAX 10 dH WSO 200 9 10 M 90 100 0 5 5 25 6 288 055 0 216 RU...
Page 217: ...31 1000 217 RU...
Page 218: ...32 1 2 3 4 5 6 7 6 15 1 2 MAX 1 2 K RCHER 1 218 RU...
Page 225: ...39 1 225 RU...
Page 226: ...40 1 1 2 3 0 6 4 1 3 5 6 7 8 226 RU...
Page 227: ...41 1 0 5 M a 5 B 227 RU...
Page 228: ...42 0 3 3 RO 2 RO 228 RU...
Page 229: ...43 RO RO RO RO 229 RU...
Page 232: ...46 232 RU...
Page 239: ...7 1 Punkt menu 2 Parametr 239 PL...
Page 240: ...8 1 Punkt menu 2 Parametr 240 PL...
Page 247: ...15 Przeznaczenie Schemat przep ywu wersja dwunarz dziowa 247 PL...
Page 248: ...16 Schemat przep ywu wersja jednonarz dziowa 248 PL...
Page 254: ...22 254 PL...
Page 255: ...23 255 PL...
Page 273: ......
Page 274: ......
Page 275: ......
Page 276: ...http www kaercher com dealersearch...