Initial Start--- up
7 --- 37
7.3
Checking Installation and Operating Conditions
Carry out all the items in the checklist before starting the machine.
To be checked
Chapter
Done?
1
Are all the conditions for installation fulfilled?
5
2
User’s lockable supply disconnecting device installed?
6.4
3
Is the power supply as specified on the nameplate?
2
4
Supply cable section and fuse rating adequate?
2.9.2
5
All electrical connections checked for tightness?
6
Shut ---off valve fitted to compressed air outlet?
6.3
7
Connection made to air main with hose or axial compen-
sator?
6.3
8
Is there sufficient cooling oil in the separator tank?
(cooling oil indicator outside the red zone?)
9
Required quantity of cooling oil poured into the airend?
7.6
10
Motor protection relay set correctly with regard to the
power supply?
7.5
11
Are the operators fully conversant with safety regulations?
12
Supply of cooling water ensured?
(option K2)
6.5.2
13
Machine anchored to the floor?
(option H1)
6.5.1
14
Are all access doors closed and latched and all removable
panels in place and secured?
4.1.1
Tab. 37
Installation conditions checklist
7.4
Setting the overload protection cut ---out
Compressor motor:
In the star ---delta configuration the phase current is fed via the overload protection cut ---
out. This phase current is 0.58 times the rated machine current (see nameplate in the con-
trol cabinet).
To prevent the overload protection cutout from being triggered by voltage fluctuations, tem-
perature influences or component tolerances, the setting can be higher than the arithmeti-
cal phase current.
7.5
Motor Protection Switch Setting
Fan motor
In direct on ---line start the starting current is fed via the motor overload protection switch.
To prevent the overload protection switch from being triggered by voltage fluctuations, tem-
perature influences or component tolerances, the setting can be higher than the motor
rated current (see motor nameplate).
7.6
Pour cooling oil into the airend.
Material:
1 l cooling oil
The airend must be manually filled with cooling oil before initial start ---up and after being
out of use for more than 3 months.
Summary of Contents for CSD 102
Page 2: ......
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 89: ......
Page 90: ......
Page 95: ......
Page 96: ......
Page 97: ......
Page 98: ......
Page 99: ......
Page 100: ...Appendix 13 92 13 1 2 Pipeline and instrument flow diagram option C1...
Page 101: ......
Page 102: ......
Page 103: ......
Page 104: ......
Page 105: ......
Page 106: ...Appendix 13 98 13 1 3 Dimensional drawing 13 1 3 1 Air cooling option K1...
Page 107: ......
Page 108: ......
Page 109: ...Appendix 13 101 13 1 3 2 Water cooling option K2...
Page 110: ......
Page 111: ......
Page 112: ...Appendix 13 104 13 1 4 Electrical diagram...
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......