![KAESER CSD 102 Service Manual Download Page 44](http://html1.mh-extra.com/html/kaeser/csd-102/csd-102_service-manual_649407044.webp)
Initial Start--- up
7 --- 36
7
Initial Start--- up
7.1
Safety
Voltage!
Contact with live electric components can cause serious injury or death.
Isolate all phases of the main power supply.
(switch off the mains supply disconnecting device)
Ensure that the power supply cannot be switched on again (locked
off).
Check that no voltage is present.
Uncontrolled pressure release!
Serious injury or death can result from loosening or opening components
under pressure.
Close shut ---off valves or otherwise isolate the machine from the air
main to ensure that no compressed air can flow back into the ma-
chine.
De---pressurize all pressurized components and enclosures.
Check all machine hose connectors with a hand ---held pressure gauge
to ensure that all read zero .
Initial start ---up may only be carried out by authorised personnel!
Before switching on ensure that:
no one is working on the machine,
all panels are in place and secured,
all access doors are closed.
7.2
To be Observed Before Every Initial Start ---up
Initial start ---up of the machine may only be carried out by trained and authorised installa-
tion or maintenance personnel.
Incorrect or improper initial start ---up can cause personal injury or damage to the machine.
Special measures on re --- starting after storage
Storage period longer
than...
Remedy
12 months
Change the oil filter.
Change the oil separator cartridge.
Change the cooling oil.
Have the motor bearings checked by an authorised
KAESER service agent.
36 months
Have the overall technical condition checked by an autho-
rised KAESER service agent.
Tab. 36
Re ---starting after storage
DANGER
WARNING
Summary of Contents for CSD 102
Page 2: ......
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 89: ......
Page 90: ......
Page 95: ......
Page 96: ......
Page 97: ......
Page 98: ......
Page 99: ......
Page 100: ...Appendix 13 92 13 1 2 Pipeline and instrument flow diagram option C1...
Page 101: ......
Page 102: ......
Page 103: ......
Page 104: ......
Page 105: ......
Page 106: ...Appendix 13 98 13 1 3 Dimensional drawing 13 1 3 1 Air cooling option K1...
Page 107: ......
Page 108: ......
Page 109: ...Appendix 13 101 13 1 3 2 Water cooling option K2...
Page 110: ......
Page 111: ......
Page 112: ...Appendix 13 104 13 1 4 Electrical diagram...
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......