Installation
6 --- 35
Fig. 14
Heat recovery
A
Outlet
10
Shut ---off valve
B
Inlet
12
Connection port with stopper
17
Pressure relief valve
The user is to provide the following fittings:
Dirt trap with max. 0.1 mm strainer mesh.
Shut ---off valves (10) and connection ports (12) for maintenance and venting.
Pressure relief valve (17) on the inlet (B) prevents build ---up of excessive pressure.
Blowoff pressure and capacity are related to the user’s installation design.
Keep to the heat exchanger technical specification.
Connect the water lines to the fittings.
Open the shut ---off valve on the outlet (A).
Slowly open the inlet (B) shut ---off tap to gradually fill the heat exchanger with water.
Vent the lines.
6.5.3.2
External heat recovery system (option W1)
The dimensional drawing in chapter 13.1.3 gives the flow direction, size and position of the
connection ports.
Follow the manufacturer’s instructions on connecting the external heat exchanger.
Summary of Contents for CSD 102
Page 2: ......
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 89: ......
Page 90: ......
Page 95: ......
Page 96: ......
Page 97: ......
Page 98: ......
Page 99: ......
Page 100: ...Appendix 13 92 13 1 2 Pipeline and instrument flow diagram option C1...
Page 101: ......
Page 102: ......
Page 103: ......
Page 104: ......
Page 105: ......
Page 106: ...Appendix 13 98 13 1 3 Dimensional drawing 13 1 3 1 Air cooling option K1...
Page 107: ......
Page 108: ......
Page 109: ...Appendix 13 101 13 1 3 2 Water cooling option K2...
Page 110: ......
Page 111: ......
Page 112: ...Appendix 13 104 13 1 4 Electrical diagram...
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......