
1 Introduction
14
1.7
Module overview
1.7.1
Central processing unit
The central processing unit JUMO variTRON 300 along with the proven input and output modules (incl.
controller module) as well as the router modules (primarily router module 1-port, 705043) form a com-
plete system.
The central processing unit manages all configuration and parameter data of the complete system and
makes a PLC acc. to IEC 61131-3 (CODESYS V3.5) available (extra code). The PLC can be activated
in different versions:
•
CODESYS runtime system
•
CODESYS runtime system incl. Remote TargetVisu
•
CODESYS runtime system incl. WebVisu
•
CODESYS runtime system incl. Remote TargetVisu and WebVisu
For visualization, commercially available panels are used which support CODESYS Remote TargetVisu
or WebVisu functionality. The visualization is also possible via web browser. Visualizations have to be
implemented with CODESYS resources (see order details).
A convenient setup program is used for configuration. JUMO standard functions for CODESYS are pro-
vided in libraries (as of system version 6) and can be individually integrated into the customer applica-
tion.
As of system version 5, the central processing unit JUMO variTRON 300 is also optionally usable as a
receiver for the JUMO Wtrans transmitters, thereby enabling wireless transmission of measured values.
Module designation
Data sheet
Features
JUMO variTRON 300
Central processing unit
705003
•
Process mapping for all connected input/out-
put modules (incl. controller modules)
•
Display and keys to display the system status
•
USB host interface
•
OPC UA server (in conjunction with PLC)
•
9 program generators (in conjunction with
PLC)
•
Field bus interface (RS485; Modbus RTU in
conjunction with PLC)
•
PROFINET IO controller (in conjunction with
PLC)
•
Plug and Play for input/output module replace-
ment
•
Battery-buffered RAM
•
Real-time clock
Summary of Contents for 705003
Page 2: ......
Page 6: ...Contents...
Page 20: ...1 Introduction 20...
Page 25: ...25 2 Mounting 2 3 Dimensions 101 110 5 45 94 5 101 5 17 5...
Page 26: ...2 Mounting 26...
Page 68: ...4 Operation 68 The files are available for download in the web browser click on the file...
Page 94: ...5 Configuration 94...
Page 98: ...6 Startup 98...
Page 109: ...109 7 Annex 7 5 China RoHS...
Page 110: ...7 Annex 110...
Page 111: ......