Day-to-Day Operation
4
STERRAD
®
200 User’s Guide
53
Completing a Cycle
Cycle completion is signaled as follows:
•
A long beep sounds.
•
The paper printout (on the input side) shows the process parameters (in black
letters only; red letters usually indicate a problem).
•
For two door configurations requiring an ID and password: Cycle Completed
Successfully is shown on the display. You are automatically logged out from
the input side and must log in to the output side to open the door and remove
the load. After the load is removed, touch
Done
and
Close Doo
r to log out
from the output side.
•
For one-door configurations requiring an ID and password: Cycle Completed
Successfully is shown on the display. After the load is removed, touch
Done
and
Close Door
to activate the log in screen for the next load.
Figure 20. Cycle Complete display for systems requiring an ID and password.
Summary of Contents for ASP STERRAD 200
Page 1: ...STERRAD 200 Sterilization System User s Guide REF 99712 99712_01 May 2008...
Page 16: ......
Page 28: ......
Page 37: ...Day to Day Operation 4 STERRAD 200 User s Guide 35 STERRAD CycleSure Biological Indicator...
Page 63: ...Day to Day Operation 4 STERRAD 200 User s Guide 61 Cycle Completion Flow Chart...
Page 74: ......
Page 82: ......