![JLG TOUCAN 1210 Service Manual Download Page 123](http://html1.mh-extra.com/html/jlg/toucan-1210/toucan-1210_service-manual_2020183123.webp)
123
Models
Revision 03-2012
Toucan 1210
Toucan 1310
7.11.6 Preventive maintenance and
inspection every 500 hours
Preventive maintenance / inspection must include
verification of the following points and must be
performed by a technician approved by JLG :
- Turntable bolt torque(§ 6.3)
- Lifting chain wear (see § 7.8.1)
- Telescopic mast alignment / bronze spacers on
the roller pins (see § 7.6)
- Pressure relief valve adjustment (see § 3.9.12)
- Lubrication (see § 7.12)
NOTE
The platform must be controlled by an
authorized body or an authorized technician
in accordance with the local or national
regulations in force.
NOTE
Extinguishers (optional equipment) must be
checked in accordance with the regulations
in force.
NOTE
The turntable attachment bolts must be
tightened after the first 50 hours of operation.
SERVICE - MAINTENANCE
7
7