![JLG TOUCAN 1210 Service Manual Download Page 122](http://html1.mh-extra.com/html/jlg/toucan-1210/toucan-1210_service-manual_2020183122.webp)
Models
Revision 03-2012
122
Toucan 1210
Toucan 1310
SERVICE - MAINTENANCE
7
7
7.11.3 Monthly preventive maintenance
and inspection
Monthly preventive maintenance / inspection must
include verification of the following points :
- Lubrication of lifting chains (see § 7.8)
- Battery electrolyte gravity (see§ 5.1.1)
- Lubrication (see § 7.12)
7.11.4 Preventive maintenance and
inspection every 125 hours
Preventive maintenance / inspection must include
verification of the following points :
- Cylinders (leak, rod, load holding valves)
- Condition of the lifting chains (see § 7.8)
- Condition of the batteries (see § 5.1)
- Wheel nut torque (see § 6.2).
- Stability control adjustment (see § 4.2.7)
- Tilt indicator setting (voir § 4.2.6)
- Cleaning of the motor ventilation holes (see §
7.9)
- Steering bracket thrust washers (see § 7.4)
- Release pressure of the brakes
- Condition of the bushes on the jib and steering
system
- Lubrication (see § 7.12).
7.11.5 Preventive maintenance and
inspection every 250 hours
Preventive maintenance / inspection must include
verification of the following points :
- Replacement of the hydraulic filters (see § 3.3)
- Motor brushes of the hydraulic power unit's (see
§ 7.9)
- Lubrication (see § 7.12)
7.11 Preventive maintenance
and inspection
(See the Operator's and Safety Manual).
Control and service intervals must be
respected to ensure safe operation of the
work platform. The platform must not be used
unless it works PERFECTLY : it must be repaired
and checked by competent and qualified
personnel before resuming operation.
NOTE
If the platform remained idle for a long period
of time, all the cleaning, control and lubrication
procedures described below must be
performed before the machine is used again.
7.11.1 Daily preventive maintenance and
inspection
Daily preventive maintenance / inspection must include
verification of the following points :
- Presence and legibility of the Operator's and
Safety Manual.
- Presence and legibility of decals - warnings
and instructions.
- Good working order of controls/indicators/safety
devices
- State of charge of the battery on the discharge
indicator
- Condition of tyres
- Hydraulic oil level
- Condition of the jib and of its fixations
- Presence of bolts and pins
7.11.2 Weekly preventive maintenance
and inspection
Weekly preventive maintenance / inspection must
include verification of the following points :
- Presence of wheel nuts
- Hydraulic hoses and fittings (leaks)
- Electrolyte level in the battery (see § 5.1.1)
- Cylinders
- Verification / water drainage from the battery
container (see § 7.10)
- Lubrication (see § 7.12)
! CAUTION