© 2020, JAPAN CASH MACHINE CO., LTD.
6 - 2
Section 6
UBA™ Pro Series Universal Banknote Acceptor
Calibration and Testing
5. Click the “
Next>
”
Screen Button (Figure
a
) when the “
Destination Folder
” Screen
shown in Figure 6-4 appears.
6. When the “
Ready to Install the Program
” Screen
appears, select “
Anyone who uses this computer
(all users)
a
) and then click the
“
Install
”
Screen Button (Figure 6-5
b
) to
start the installation.
7. Once installation is complete, the “
InstallShield
Wizard Completed
” Screen shown in Figure 6-6
will appear.
Click the “
Finish
”
Screen Button (Figure
a
) to end the installation process.
This completes the “
JCM Tool Suite Standard Edition
”
installation procedure.
Part 2 - USB Drivers Installation
USB Drivers need to be installed on the PC before
the JCM Tool Suite Standard Edition can be used.
To install the Driver, proceed as follows:
1. Copy the provided Driver into the desired PC
Folder.
2. Connect the USB Cable to the Unit. (Refer to
Figure 6-1 for the Tool Requirements and Har-
ness Connector locations.)
3. When the Device Driver Installation Wizard
Screen (Figure 6-7) appears, click the “
Next>
”
Screen Button (Figure 6-7
a
) to install the
driver.
4. When the USB Driver Installation is complete,
the “
Completing the Device Driver Installation
Wizard
” Screen will appear as shown in Figure 6-
5. Click the “
Finish
”
Screen Button (Figure
a
) to close the Screen.
This completes the USB driver installation proce-
dure.
Figure 6-4
Figure 6-4
JCM Tool Suite Installation 3
a
Figure 6-5
Figure 6-5
JCM Tool Suite Installation 4
b
a
Figure 6-6
Figure 6-6
JCM Tool Suite Installation 5
a
NOTE: The USB Driver Installation Wizard
Screen appears when the JCM Tool Suite
installation is completed (Go to Step 3).
NOTE: Step 1 and 2 are reserved for when the
USB Drivers need to be installed manually.
Figure 6-7
Figure 6-7
USB Drivers Installation 1
a
Figure 6-8
Figure 6-8
USB Drivers Installation 2
a
NOTE: If the Windows Security Screen appears,
select “Install this Driver Software (I)” to proceed.
Summary of Contents for UBA Pro Series
Page 8: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD v i THIS PAGE INTENTIONALLY LEFT BLANK...
Page 14: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD x i i THIS PAGE INTENTIONALLY LEFT BLANK...
Page 16: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD x i v THIS PAGE INTENTIONALLY LEFT BLANK...