© 2020, JAPAN CASH MACHINE CO., LTD.
6 - 2 2
Section 6
UBA™ Pro Series Universal Banknote Acceptor
Calibration and Testing
3. Apply electrical power.
4. Confirm that the
Green
and
Red
Status LEDs are
lit.
5. To start the Test, set the DIP Switch #8 to
OFF
6. Set the DIP Switches to
OFF
7. Confirm that the
Red
LED is lit.
8. Set the DIP Switches to
OFF
9. The
Green
LED will be lit.
10. Set the UBA Pro DIP Switch #8 to
ON
to end the
test.
Stacking Operation Test
To perform the Stacking Operation Test, proceed as
follows:
1. Remove electrical power.
2. Set the DIP Switches as below (Figure 6-110).
3. Apply electrical power.
4. Confirm that the
Green
and
Red
Status LEDs are
lit.
5. To start the Test, set the DIP Switch #8 to
OFF
6. The stacking operation will begin.
7. Set the UBA Pro DIP Switch #8 to
ON
to end the
test.
Figure 6-104
Figure 6-104
DIP Switch Test 2
Green Red
Figure 6-105
Figure 6-105
DIP Switch Test 3
DIP Switch #8 OFF
ON
1
2
3
4
5
6
7
8
Figure 6-106
Figure 6-106
DIP Switch Test 4
DIP Switches #1, #3, #5, #7 OFF
ON
1
2
3
4
5
6
7
8
Figure 6-107
Figure 6-107
DIP Switch Test 5
Red
Figure 6-108
Figure 6-108
DIP Switch Test 6
DIP Switches #2, #4, #6 OFF
ON
1
2
3
4
5
6
7
8
Figure 6-109
Figure 6-109
DIP Switch Test 7
Figure 6-110
Figure 6-110
Stacking Operation Test 1
DIP Switches #3, #8 ON
ON
1
2
3
4
5
6
7
8
Figure 6-111
Stacking Operation Test 2
Green Red
Figure 6-112
Figure 6-112
Stacking Operation Test 3
DIP Switch #8 OFF
ON
1
2
3
4
5
6
7
8
Summary of Contents for UBA Pro Series
Page 8: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD v i THIS PAGE INTENTIONALLY LEFT BLANK...
Page 14: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD x i i THIS PAGE INTENTIONALLY LEFT BLANK...
Page 16: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD x i v THIS PAGE INTENTIONALLY LEFT BLANK...