Calibration and Testing
UBA™ Pro Series Universal Banknote Acceptor
Section 6
Entrance Motor Operation Test
(Reverse)
To perform the Entrance Motor Operation Test in the
reverse rotation, proceed as follows:
1. Remove electrical power.
2. Set the DIP Switches as below (Figure 6-129).
3. Apply electrical power.
4. Confirm that the
Green
and
Red
Status LEDs are
lit.
5. Lift up on the Upper Guide Access Lever to open
the UBA Pro’s Cover
6. To start the Test, set the DIP Switch #8 to
OFF
7. The Rollers will start running in the reverse
direction when the Feed Motor functions prop-
erly.
8. Set the UBA Pro DIP Switch #8 to
ON
to end the
test.
Entrance and Feed Motors
Simultaneous Operation Test (For-
ward)
To perform the Motor Operation Test of the Entrance
Motor and the Feed Motor in the forward rotation at the
same time,
proceed as follows:
1. Remove electrical power.
2. Set the DIP Switches as below (Figure 6-133).
3. Apply electrical power.
4. Confirm that the
Green
and
Red
Status LEDs are
lit.
5. Lift up on the Upper Guide Access Lever to open
the UBA Pro’s Cover
6. To start the Test, set the DIP Switch #8 to
OFF
7. The Rollers will start running in the forward
direction when the Entrance and Feed Motors
function properly.
8. Set the UBA Pro DIP Switch #8 to
ON
to end the
test.
Figure 6-129
Figure 6-129
Entrance Motor Operation Test
(Reverse) 1
DIP Switches #5, #6, #8 ON
ON
1
2
3
4
5
6
7
8
Figure 6-130
Figure 6-130
Entrance Motor Operation Test
(Reverse) 2
Green Red
Figure 6-131
Figure 6-131
Entrance Motor Operation Test
(Reverse) 3
DIP Switch #8 OFF
ON
1
2
3
4
5
6
7
8
Figure 6-132
Entrance Motor Operation Test
(Reverse) 4
Figure 6-133
Simultaneous Speed Test (Forward) 1
Figure 6-133
Entrance and Feed Motors
Simultaneous Speed Test (Forward) 1
DIP Switches #1, #6, #8 ON
ON
1
2
3
4
5
6
7
8
Figure 6-134
Entrance and Feed Motors
Simultaneous Speed Test (Forward) 2
Green Red
Figure 6-135
Simultaneous Speed Test (Forward) 3
Figure 6-135
Entrance and Feed Motors
Simultaneous Speed Test (Forward) 3
DIP Switch #8 OFF
ON
1
2
3
4
5
6
7
8
Figure 6-136
Entrance and Feed Motors
Simultaneous Speed Test (Forward) 4
Summary of Contents for UBA Pro Series
Page 8: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD v i THIS PAGE INTENTIONALLY LEFT BLANK...
Page 14: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD x i i THIS PAGE INTENTIONALLY LEFT BLANK...
Page 16: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD x i v THIS PAGE INTENTIONALLY LEFT BLANK...