© 2020, JAPAN CASH MACHINE CO., LTD.
4 - 2
Section 4
UBA™ Pro Series Universal Banknote Acceptor
Disassembly/Reassembly
3. Unplug the two (2) Connectors (Figure 4-4
a
1
&
a
2
), and remove the FPC Harness (Figure 4-4
b
).
4. Remove the three (3) Screws (Figure 4-5
a
1
through
a
3
), and remove the LED Light Module
b
).
5. Remove the two (2) Screws (Figure 4-5
c
1
&
c
2
),
and remove the Upper Bar Sensor (Figure 4-5
d
).
Box Sensor Removal
To remove the Box Sensor, proceed as follows:
1. Release the two (2) Locking Tabs (Figure 4-6
a
1
&
a
2
), and remove the Back Cover (Figure 4-6
b
).
2. Unplug the single (1) Connector (Figure 4-7
a
),
and remove the FPC Harness (Figure 4-7
b
).
3. Remove the two (2) Screws (Figure 4-7
c
1
&
c
2
),
and remove the Box Sensor (Figure 4-7
d
).
Sub Board Removal
To remove the Sub Board, proceed as follows:
1. Release the six (6) Locking Tabs (Figure 4-8
a
1
through
a
6
), and remove the Side Cover R (Fig-
b
).
LED Light Module and Upper Bar
a
6
a
3
a
4
a
5
a
2
Figure 4-3
LED Light Module and Upper Bar
Sensor Removal 2
LED Light Module and Upper Bar
b
a
2
a
1
Figure 4-4
LED Light Module and Upper Bar
Sensor Removal 3
LED Light Module and Upper Bar
d
b
3
c
1
c
2
Figure 4-5
LED Light Module and Upper Bar
Sensor Removal 4
b
a
1
a
2
Figure 4-6
Box Sensor Removal 1
d
1
a
b
Figure 4-7
Box Sensor Removal 2
Figure 4-8
b
a
1
a
6
a
2
a
3
a
4
a
5
Figure 4-8
Sub Board Removal 1
Summary of Contents for UBA Pro Series
Page 8: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD v i THIS PAGE INTENTIONALLY LEFT BLANK...
Page 14: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD x i i THIS PAGE INTENTIONALLY LEFT BLANK...
Page 16: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD x i v THIS PAGE INTENTIONALLY LEFT BLANK...