© 2020, JAPAN CASH MACHINE CO., LTD.
6 - 1 2
Section 6
UBA™ Pro Series Universal Banknote Acceptor
Calibration and Testing
5. The resulting indication will appear in the “
DIP
switch
a
) on the Screen.
6. Confirm that indication changes “
ON
” and
“
OFF
” as the Switch is set.
7. Click the “
Stop
”
Screen Button (Figure 6-
b
) to end the test.
Stacker Motor Operation Time Test
To perform the Stack Motor Operation Time Test, pro-
ceed as follows:
1. Launch the Performance Test Program (see
2. Select “
STACK_TEST
a
).
3. Click the “
Start
”
Screen Button (Figure 6-
b
).
4. The measured time will appear in the “
Stacker
Motor UP/DOWN
a
) on the
Screen.
5. Confirm that the operation time is in the accept-
able range: 300msec to 1000msec.
6. Click the “
Stop
”
Screen Button (Figure 6-
b
) to end the test.
PB Motor Operation Time Test
To perform the PB Motor Operation Time Test, proceed
as follows:
1. Launch the Performance Test Program (see
page 6-8).
2. Select “
PB_TEST
” (Figure 6-58
a
).
3. Click the “
Start
”
Screen Button (Figure 6-
b
).
4. The measured time will appear in the “
PB Motor
”
a
) on the Screen.
5. Confirm that the operation time is in the accept-
able range: 150msec to 300msec.
6. Click the “
Stop
”
Screen Button (Figure 6-
b
) to end the test.
Figure 6-55
Figure 6-55
DIP Switch Test 3
b
a
Figure 6-56
Stacker Motor Operation Time Test
Figure 6-56
Stacker Motor Operation Time Test 1
a
b
Figure 6-57
Stacker Motor Operation Time Test
Figure 6-57
Stacker Motor Operation Time Test 2
b
a
PB Motor Operation Time Test 1
Figure 6-58
PB Motor Operation Time Test 1
a
b
PB Motor Operation Time Test 2
Figure 6-59
PB Motor Operation Time Test 2
b
a
Summary of Contents for UBA Pro Series
Page 8: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD v i THIS PAGE INTENTIONALLY LEFT BLANK...
Page 14: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD x i i THIS PAGE INTENTIONALLY LEFT BLANK...
Page 16: ...P N 960 000211R_Rev A 2020 JAPAN CASH MACHINE CO LTD x i v THIS PAGE INTENTIONALLY LEFT BLANK...