System Set-Up
37
VIS-CAM Systems
7. Adjust the lens zoom ring to obtain a plate width approximately equal to the distance between
the short vertical sizing marks that appear above the tilt line. Readjust focus as necessary. See
Figure 31 for more information.
Figure 37.
Initial Camera Alignment Display example.
8. Turn on the “Roll Bar” display on the Setup computer and then roll the camera mount until the
horizontal bumper and trunk seams on the vehicle appear perfectly level with the horizontal
line of the display. Use one 7/16" closed-end wrench on the roll gear to fine-tune the roll angle.
Hold the roll position with the wrench while you use a second wrench to gently tighten the
other roll bolts. Then apply both wrenches to corresponding bolts on opposite sides of the
mount. Twisting in opposite directions to fully secure all of the roll bolts. This approach
prevents the roll adjustment from changing while you tighten the bolts. See Figure 32.
Summary of Contents for VIS-CAM System
Page 1: ...VIS CAM System Vehicle Imaging Subsystem Document Version 10436 Document P N E...
Page 2: ......
Page 12: ...VIS CAM Systems xii List of Tables...
Page 20: ...VIS CAM Systems 8 Preparing for Installation Figure 5 VIS 300 U S Camera options chart...
Page 21: ...Preparing for Installation 9 VIS CAM Systems Figure 6 VIS 350 U S Camera options chart...
Page 22: ...VIS CAM Systems 10 Preparing for Installation Figure 7 VIS 400 U S Camera options chart...
Page 23: ...Preparing for Installation 11 VIS CAM Systems Figure 8 VIS 500 U S Camera options chart...
Page 24: ...VIS CAM Systems 12 Preparing for Installation Figure 9 VIS 300 European Camera options chart...
Page 25: ...Preparing for Installation 13 VIS CAM Systems Figure 10 VIS 350 European Camera options chart...
Page 26: ...VIS CAM Systems 14 Preparing for Installation Figure 11 VIS 400 European Camera options chart...
Page 27: ...Preparing for Installation 15 VIS CAM Systems Figure 12 VIS 500 European Camera options chart...
Page 92: ...VIS CAM Systems 80 Appendix B Figure 90 Lane controller setup...
Page 100: ...VIS CAM Systems 88 Appendix E Figure 98 Operation configuration of Serial port 1...
Page 110: ......
Page 111: ......