
Tractor operation
41
3
Lever positions:
Selector control (1), linkage position
‘B’ Draft control (2), fully up position. Re-
sponse control (3), in the Slow’ position.
Operate the hydraulics by using the posi-
tion control lever (4).
Transporting implement:
Put the position control lever in
‘Transport’ position.
Fig. 9:
4
2
5
3
1
Starting work:
Move the position control lever down
until the required implement height above
up and down erratically turn the response
control towards ‘Slow’.
Leaving work:
Pull the draft control lever up.
Fig. 8:
2
4
1
5
3
Position control (Fig. 9) inner
lever -red sector.
Type of work:
Operation which requires the imple-
ment to be kept at a constant height above
the ground.
Draft control (Fig. 8) outer le-
ver -yellow quadrant
Type of work:
Ploughing; subsoiling; heavy cultiva-
tion.
Lever positions:
Selector control (1), linkage position
‘B’.
Position control (2), fully up in ‘Trans-
port’ position.
Response control (3), In the Slow’ po-
sition.
Operate the hydraulics using the draft
control lever (4).
Starting work:
Push the draft control lever down until
the implement reaches the required depth.
Set the adjustable stop (5) in line with the
lever.
In work:
The draft control lever can be moved
slightly to suit varying soil conditions.
Set the response control towards slow
but in a position to allow adequately fast
entry into work. If the implement moves
Summary of Contents for ITM 800
Page 2: ......
Page 4: ......
Page 22: ...General information 1 16 Safety decal location Both side Both side Both side ...
Page 23: ...1 General information 17 General decal location ...
Page 24: ......
Page 60: ......
Page 116: ...Specifications 110 5 Fig 1 Front wiring diagram ...
Page 117: ...Specifications 111 5 Fig 2 Wiring diagram footstep tractors ...
Page 118: ...Specifications 112 5 Fig 3 Wiring diagram cab tractors For wiring diagram see figure 1 ...