In all the above cases the neutral connection terminal (-XN) is located inside the DCAC connections module.
-XN
16.3. Connecting the AC phases via busbars
16.3.1. Requirements for the AC phase connection busbars
If using busbars for the AC connection, the requirements must be established with Ingeteam according to the
characteristics of the PV plant.
16.3.2. Connection process
Proceed in the following order for each phase:
1. Clean the contact surfaces on both the terminal and the busbar with a clean cloth and ethanol.
2. Connect the busbars using the bolts, nuts and washers specified by Ingeteam, applying a tightening
torque of 42 Nm with NLGI 1 anti-seize lubrication.
110
AC connection
Ingeteam
Summary of Contents for INGECON SUN 1000TL U B360
Page 1: ...INGECON SUN PowerMax TL U B 1000 Vdc Installation and Operation Manual...
Page 22: ...ABK2027IQE01_A Installation and Operation Manual DC supply 22 Unit description Ingeteam...
Page 176: ...Notes...
Page 177: ...Notes...
Page 178: ...Notes...
Page 180: ...ABK2027IQE01_A 05 2019 Ingeteam Power Technology S A www ingeteam com...