2.14. Electrical diagram of the unit
15+
15-
3+
2+
1+
1-
2-
3-
A
B
C
F
G
H
E
D
I
A. DC fuses, optional
B. Motorized DC switch
C. DC surge arresters
D. Inverter.
E. Filter
F. AC surge arresters
G. AC thermomagnetic circuit breaker
H. Transformer
I.
AC output for connection to MV grid
2.15. Electrical diagram of the system
The configuration of the high-voltage winding of the grid connection transformer does not affect the behavior of the
unit.
3
Inverter
Ingeteam recommends using a transformer with Dy11 connection.
32
Unit description
Ingeteam
Summary of Contents for INGECON SUN 1000TL U B360
Page 1: ...INGECON SUN PowerMax TL U B 1000 Vdc Installation and Operation Manual...
Page 22: ...ABK2027IQE01_A Installation and Operation Manual DC supply 22 Unit description Ingeteam...
Page 176: ...Notes...
Page 177: ...Notes...
Page 178: ...Notes...
Page 180: ...ABK2027IQE01_A 05 2019 Ingeteam Power Technology S A www ingeteam com...