ABK2027IQE01_A - Installation and Operation Manual
19.2. Display
2018/07/09
11:23
2018/07/09
11:23
A
D
E
C
B
A. Current date, YYYY-MM-DD.
B. Power reduction percentage and reason for this reduction*.
C. Current time, hh:mm. If there is a loss of communication between the inverter and the display, the two
points stop blinking.
D. Voltage and power of the PV array. Both pieces of data are displayed alternately.
E. Power, voltage and current fed to the grid.
Pressing the key
takes you to the main menu. Pressing the key
displays the daily power graph. Pressing
displays the energy graph for the last 24 days.
* The reasons for power reduction are as follows:
T: Temperature. The inverter is limiting the power due to internal overheating.
C: Communications. The inverter is limiting the power after having received a reduction setpoint through
communications.
F: Grid frequency. The inverter is limiting the power due to the grid frequency variation.
V: Grid voltage. The inverter is limiting the power due to the grid voltage variation.
Q: Reactive priority. The inverter is limiting the power due to the injection of reactive power.
A: Configuration. The inverter is configured to limit its power.
R: Initial connection ramp. The inverter is limiting the power after a reconnection to the grid.
S: Self consumption mode. The inverter is limiting the power due to functioning in self consumption
mode.
M: Reserved mode.
129
Display control
Ingeteam
Summary of Contents for INGECON SUN 1000TL U B360
Page 1: ...INGECON SUN PowerMax TL U B 1000 Vdc Installation and Operation Manual...
Page 22: ...ABK2027IQE01_A Installation and Operation Manual DC supply 22 Unit description Ingeteam...
Page 176: ...Notes...
Page 177: ...Notes...
Page 178: ...Notes...
Page 180: ...ABK2027IQE01_A 05 2019 Ingeteam Power Technology S A www ingeteam com...