Completing the Installation
Attention:
Be sure to maintain a clearance of at least 127 mm (5 inches) on the front and
rear of the server to allow for air circulation.
5. Reconnect the cables to the back of the server; then, plug the power cords into
properly grounded electrical outlets.
6. If you have a modem or fax machine attached to the server, reconnect the
telephone line to the wall outlet and the server.
What to do next
When you have completed installing the covers and cables, go to “Updating the
Server Configuration” on page 82.
78
Netfinity 5000 Server Hardware Information and Procedures