![Hyundai HL630VL Operator'S Manual Download Page 122](http://html1.mh-extra.com/html/hyundai/hl630vl/hl630vl_operators-manual_2196161122.webp)
Inspection, Maintenance and Adjustment 4-3
PREPARATION AND SETTING
OF THE EQUIPMENT BEFORE
MAINTENANCE
Park the vehicle as the following requirements before perfor-
mance of maintenance according to the regulations in this man-
ual.
Note:
Some special maintenance requires the machinery has
different parking mode. However, after completion of
maintenance, the machine must be reset to the following
positions.
1. Park on the hard plane.
2. Put the Bucket on the ground.
3. Switch off the engine and pull off the key
4. Put the control lever at middle position
Fig 3
Especially be careful for running the engine during the
maintenance. When the engine is running, let one person
always stand in the cab without leaving.
WARNING
5. Before starting work, hang a warning sign “Do Not Touch
When Performing Inspection Or Maintenance” on the cab
door or on the working pole.
Summary of Contents for HL630VL
Page 1: ......
Page 3: ......
Page 5: ......
Page 7: ......
Page 51: ......
Page 61: ...2 10 Operation Controls Schematic Fig 11 ...
Page 119: ......
Page 126: ...Inspection Maintenance and Adjustment 4 7 LUBRICATION OIL AND MAINTENANCE CHART Figure 4 ...
Page 161: ......