OPeRATION
powermax
65/85
Operator Manual
4-9
Operating the Powermax65 or Powermax85
Follow the steps below to begin cutting or gouging with the Powermax65 or Powermax85.
Connect the electrical power, gas supply, and torch lead
For information on connecting the proper power cord with plug to the power supply, refer to
the section “Power connection for the Powermax65” on page 2-6 or “Power connection for the
Powermax85” on page 2-8.
Plug in the power cord and connect the gas supply line. For more information about the electrical
requirements and the gas supply requirements of the Powermax65 and Powermax85, see
Section 2, Power Supply Setup
. To connect the torch, push the FastConnect
TM
connector into the
receptacle on the front of the power supply You will attach the work lead in the next section.
Power cord with
appropriate plug
Work lead
Torch lead
Gas
supply
line
Summary of Contents for Powermax 65
Page 1: ...Plasma arc cutting systems Operator Manual 806650 Revision 0 85 ...
Page 10: ...Table of Contents vi powermax65 85 Operator Manual WARRANTY vi Hypertherm ...
Page 30: ...Specifications 1 16 powermax65 85 Operator Manual ...
Page 140: ...Maintenance and Repair 5 12 powermax65 85 Operator Manual ...