3
Coupling
Operation
53
Coupling process
Pic. 24
Coupling
1
Bolt coupling (yoke bar)
2
Centre axle
3
Towing ring
Open the bolt coupling (Pic. 24 /1).
Leave the danger zone between the
towing vehicle and the trailer.
Move the towing vehicle back, so that
the towing ring (Pic. 24 /3) engages in
the bolt coupling.
If the bolt coupling should fail to engage:
You can correct the height, using the
lifting / lowering system.
Activate the parking brake of the
towing vehicle.
Ensure that the bolt coupling has been
properly connected and secured.
If the coupling has not been properly
locked:
Open the coupling.
Drive the towing vehicle forwards.
Repeat the coupling process.
B - 022
1
2
3
Summary of Contents for 10000 Series
Page 6: ...Contents 4 ...
Page 11: ...9 1 Safety ...
Page 28: ...Personal protective equipment rules prohibitions 26 Safety 1 ...
Page 29: ...27 2 General information ...
Page 39: ...37 3 Operation ...
Page 61: ...59 4 Operating the chassis ...
Page 102: ...100 Operating the chassis Warning tables optional 4 ...
Page 103: ...101 5 Operating the body ...
Page 144: ...5 Roll up tarpaulin optional 142 Operating the body ...
Page 145: ...143 6 Electrical system ...
Page 158: ...6 TIM iTAP 156 Electrical system ...
Page 159: ...157 7 Inspection care and maintenance ...
Page 218: ...7 Disposal 216 Inspection care and maintenance ...
Page 219: ...217 8 Troubleshooting ...