5
Drop sides
110
Operating the body
Unlocking the central locking system
Pic. 17
Unlocking the central locking system
1
Lever
The lateral drop side must be
closed and secured with the
upper locks.
Grab the lever (Pic. 17 /1) and pull it to
the limit stop (Pic. 18 /2).
Pic. 18
Drop side unlocked
1
Transmission linkage
2
Limit stop
The transmission linkage (Pic. 18 /1) is
pulled and acts on the rotary linkage
(Pic. 19 /2) that unlocks the locking
points (Pic. 19 /1).
Visually check that all locking points
are unlocked.
Pic. 19
Drop side unlocked at the lower end
1
Locking point, open
2
Rotary linkage
The locking points release the lateral
drop side for swivelling.
Tip the loading bridge.
The lateral drop side swivels.
A - 014
1
A - 071
1
2
A - 072
1
2
Summary of Contents for 10000 Series
Page 6: ...Contents 4 ...
Page 11: ...9 1 Safety ...
Page 28: ...Personal protective equipment rules prohibitions 26 Safety 1 ...
Page 29: ...27 2 General information ...
Page 39: ...37 3 Operation ...
Page 61: ...59 4 Operating the chassis ...
Page 102: ...100 Operating the chassis Warning tables optional 4 ...
Page 103: ...101 5 Operating the body ...
Page 144: ...5 Roll up tarpaulin optional 142 Operating the body ...
Page 145: ...143 6 Electrical system ...
Page 158: ...6 TIM iTAP 156 Electrical system ...
Page 159: ...157 7 Inspection care and maintenance ...
Page 218: ...7 Disposal 216 Inspection care and maintenance ...
Page 219: ...217 8 Troubleshooting ...