7
Mechanical adjustments
Inspection, care and maintenance
179
Adjusting the tubular drawbar
Pic. 43
Front connection
1
Tubular drawbar ZR8
2
Screw connection M16
Permitted screw connections are
ratchet screws sized:
12 x M16
ratchet screws,
with M16 nuts (strength 10.9)
Check that the screw connections
(Pic. 43 /2) are approved and not
damaged.
Pic. 44
Rear connection
1
Screw connection M16 (10,9)
Fasten the screw connections
(Pic. 44 /1) after adjusting the tubular
drawbar (Pic. 43 /1) with the following
fastening torques:
M16: 320±10 Nm
Check that the supply lines have not
been damaged.
Check the stability and functionality of
the tubular drawbar.
DANGER
Inappropriate screw connections
used
The tubular drawbar may come loose /
break - accident risk!
Only use the prescribed screws / nuts
and the required number of screws.
Replace corroded / defective
connecting elements.
After adjusting the tubular
drawbar, the operator is
responsible for ensuring stability
and appropriate use!
The structure of the tubular
drawbar may not be changed
(e.g. by drilling, welding)!
W - 079
1
50 50
50
2
W - 080
1
Summary of Contents for 10000 Series
Page 6: ...Contents 4 ...
Page 11: ...9 1 Safety ...
Page 28: ...Personal protective equipment rules prohibitions 26 Safety 1 ...
Page 29: ...27 2 General information ...
Page 39: ...37 3 Operation ...
Page 61: ...59 4 Operating the chassis ...
Page 102: ...100 Operating the chassis Warning tables optional 4 ...
Page 103: ...101 5 Operating the body ...
Page 144: ...5 Roll up tarpaulin optional 142 Operating the body ...
Page 145: ...143 6 Electrical system ...
Page 158: ...6 TIM iTAP 156 Electrical system ...
Page 159: ...157 7 Inspection care and maintenance ...
Page 218: ...7 Disposal 216 Inspection care and maintenance ...
Page 219: ...217 8 Troubleshooting ...