IDS1000 Container Data Center
User Manual
3 Power-On Commissioning
Issue 01 (2014-3-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
27
Figure 3-21
Loop fault alarm indicators for the smoke detector and heat detector (Zone 1 for the
smoke detector, and Zone 2 for the heat detector).
Step 7
After the test is complete, reset the gas extinguishing controller.
Step 8
(Optional) Check that the fire control signals are reported to the monitoring center.