Hardware options installation 45
11.
Align the PCI riser board with the corresponding connector on the system board, and then press
down the riser cage.
CAUTION:
To prevent improper cooling and thermal damage, do not operate the server
unless all PCI slots have either an expansion slot cover or an expansion board installed.
12.
Connect the Mini-SAS cable to the drive backplane.
13.
Install the access panel (on page
21
).
14.
Do one of the following:
o
Slide the server into the rack.
o
Install the server into the rack ("
Installing the server into the rack
" on page
30
).
15.
Connect each power cord to the server.
16.
Connect each power cord to the power source.
17.
Power up the server (on page
17
).
18.
If removed, install the security bezel ("
Security bezel option
" on page
36
).
Summary of Contents for hpe proliant dl20 gen9
Page 14: ...Component identification 14 2 bay LFF non hot plug drive model 2 bay LFF hot plug drive model ...
Page 88: ...Cabling 88 2 bay LFF non hot plug configuration Optical drive cabling 2 LFF configuration ...
Page 92: ...Cabling 92 2 bay LFF hot plug drive configuration ...
Page 120: ...Support and other resources 120 ...
Page 121: ...Support and other resources 121 ...