
Hardware options installation 58
To install the component:
1.
If installed, remove the security bezel (on page
17
).
2.
Power down the server (on page
17
).
3.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
4.
Do one of the following:
o
Extend the server from the rack (on page
18
).
o
Remove the server from the rack (on page
19
).
5.
Remove the access panel (on page
20
).
6.
Remove the existing PCI riser cage ("
Remove the PCI riser cage
" on page
22
).
7.
Select the appropriate PCIe slot to install the M.2 SSD enablement board and remove the PCIe
blank.
o
Slot 1
o
Slot 2
8.
If installing the M.2 SSD enablement board in slot 1 do the following:
Summary of Contents for hpe proliant dl20 gen9
Page 14: ...Component identification 14 2 bay LFF non hot plug drive model 2 bay LFF hot plug drive model ...
Page 88: ...Cabling 88 2 bay LFF non hot plug configuration Optical drive cabling 2 LFF configuration ...
Page 92: ...Cabling 92 2 bay LFF hot plug drive configuration ...
Page 120: ...Support and other resources 120 ...
Page 121: ...Support and other resources 121 ...