
Hardware options installation 47
5.
Remove the access panel (on page
20
).
6.
Remove the existing PCI riser cage ("
Remove the PCI riser cage
" on page
22
).
7.
If you intend to use an FBWC module, install the module on the storage controller.
a.
If you are installing a Smart Array P440 Controller, remove the air scoop.
b.
Connect the cache module backup power cable to the module.
c.
Install the cache module on the storage controller.
Summary of Contents for hpe proliant dl20 gen9
Page 14: ...Component identification 14 2 bay LFF non hot plug drive model 2 bay LFF hot plug drive model ...
Page 88: ...Cabling 88 2 bay LFF non hot plug configuration Optical drive cabling 2 LFF configuration ...
Page 92: ...Cabling 92 2 bay LFF hot plug drive configuration ...
Page 120: ...Support and other resources 120 ...
Page 121: ...Support and other resources 121 ...