
Hardware options installation 51
6.
Remove the optical drive blank.
7.
Install the optical drive and secure it with the screw provided in the optical drive kit.
8.
Connect and route the cables:
a.
Connect the cable assembly from the optical drive option kit to the rear of the optical drive.
b.
Connect the power cable to the optical drive extension power cable.
c.
Connect the extension cable and the SATA cable to the system board.
Summary of Contents for hpe proliant dl20 gen9
Page 14: ...Component identification 14 2 bay LFF non hot plug drive model 2 bay LFF hot plug drive model ...
Page 88: ...Cabling 88 2 bay LFF non hot plug configuration Optical drive cabling 2 LFF configuration ...
Page 92: ...Cabling 92 2 bay LFF hot plug drive configuration ...
Page 120: ...Support and other resources 120 ...
Page 121: ...Support and other resources 121 ...