Operations 19
c.
Slide the server out of the rack.
6.
After performing the installation or maintenance procedure, slide the server back into the rack, and
then press the server firmly into the rack to secure it in place.
7.
Do one of the following:
o
In a server that uses thumbscrew rack ears, tighten the captive thumbscrews.
o
In a server that uses quick-release latch rack ears, if necessary, tighten the shipping screws.
8.
Connect each power cord to the server.
9.
Connect all peripheral cables to the server.
10.
Power up the server (on page
17
).
Remove the server from the rack
Summary of Contents for hpe proliant dl20 gen9
Page 14: ...Component identification 14 2 bay LFF non hot plug drive model 2 bay LFF hot plug drive model ...
Page 88: ...Cabling 88 2 bay LFF non hot plug configuration Optical drive cabling 2 LFF configuration ...
Page 92: ...Cabling 92 2 bay LFF hot plug drive configuration ...
Page 120: ...Support and other resources 120 ...
Page 121: ...Support and other resources 121 ...