Hardware options installation 40
2 LFF Smart Array Controller Mini-SAS cable option
For more information about product features, specifications, options, configurations, and compatibility,
see the product QuickSpecs on the Hewlett Packard Enterprise website (
http://www.hpe.com/info/qs
).
To install the component:
1.
If installed, remove the security bezel (on page
17
).
2.
Power down the server (on page
17
).
3.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
4.
Do one of the following:
o
Extend the server from the rack (on page
18
).
o
Remove the server from the rack (on page
19
).
5.
Remove the access panel (on page
20
).
6.
Disconnect the existing Mini-SAS cables from the system board and the drive backplane.
7.
Remove the existing PCI riser cage ("
Remove the PCI riser cage
" on page
22
).
8.
Remove the blank from slot 2 of the riser cage.
9.
Install the Smart Array controller.
Summary of Contents for hpe proliant dl20 gen9
Page 14: ...Component identification 14 2 bay LFF non hot plug drive model 2 bay LFF hot plug drive model ...
Page 88: ...Cabling 88 2 bay LFF non hot plug configuration Optical drive cabling 2 LFF configuration ...
Page 92: ...Cabling 92 2 bay LFF hot plug drive configuration ...
Page 120: ...Support and other resources 120 ...
Page 121: ...Support and other resources 121 ...