![HP 8920B Programmer'S Manual Download Page 255](http://html.mh-extra.com/html/hp/8920b/8920b_programmers-manual_166189255.webp)
255
Chapter 5, Advanced Operations
Increasing Measurement Throughput
Optimizing Measurement Setup Time
Measurement setup time is defined as the time required to configure an individual
instrument within the Test Set to make a measurement.
In general there are two methodologies which can be used to setup individual
instruments in the Test Set:
1. Set up every field every time a measurement is made.,
2. Define a base instrument state and then modify it as needed for each measurement (al-
ways returning to the base state after finishing the measurement).
Defining a base instrument state requires fewer HP-IB transactions to set up an
instrument (in the majority of cases) which in turn reduces measurement setup
time.
Summary of Contents for 8920B
Page 10: ...10 ...
Page 16: ...Contents 16 9 Error Messages Index 673 ...
Page 17: ...17 1 Using HP IB ...
Page 48: ...48 Chapter 1 Using HP IB Remote Local Modes ...
Page 49: ...49 2 Methods For Reading Measurement Results ...
Page 61: ...61 3 HP IB Command Guidelines ...
Page 84: ...84 Chapter 3 HP IB Command Guidelines Guidelines for Operation ...
Page 85: ...85 4 HP IB Commands ...
Page 90: ...90 Adjacent Channel Power ACP ...
Page 116: ...116 Configure I O Configure ...
Page 156: ...156 Call Processing ...
Page 185: ...185 System System SYSTem ERRor Returns integer value quoted string ...
Page 242: ...242 Common Command Descriptions ...
Page 251: ...251 5 Advanced Operations ...
Page 377: ...377 7 IBASIC Controller ...
Page 458: ...458 Chapter 7 IBASIC Controller The TESTS Subsystem ...
Page 640: ...640 Chapter 8 Programming The Call Processing Subsystem Example Programs 11280 SUBEND 11290 ...
Page 643: ...643 9 Error Messages ...
Page 672: ...672 ...
Page 682: ...Index 682 ...