
3
Loosen the thumb screws.
Cards or filler panels below the slots intended for installation do not have to
be removed.
Starting from the top, loosen the thumb screws on filler panels and cards
that need to be moved.
4
Starting from the top, pull the cards and filler panels that need to be
moved halfway out.
C A U T I O N
All multi-card modules will be cabled together. Pull these cards out together
to prevent damage to the cables and connectors.
5
Remove the cards and filler panels.
Remove the cards or filler panels that are in the slots intended for the
module installation. Push all other cards into the card cage, but not
completely in. This is to get them out of the way for installing the module.
Some modules for the Logic Analysis System require calibration if you move
them to a different slot. For calibration information, refer to the Service
Guides for the individual modules.
Installation and Operator’s Service
To prepare the mainframe
11–4
Summary of Contents for 16533A
Page 6: ...vi ...
Page 11: ...1 Run Stop Options ...
Page 15: ...2 Autoscale ...
Page 21: ...3 The Channel Menu ...
Page 23: ...Channel Field Menu Map The Channel Menu 3 3 ...
Page 29: ...4 Time Base Functions ...
Page 42: ...4 14 ...
Page 43: ...5 The Marker Menu ...
Page 45: ...Markers Field Menu Map The Marker Menu 5 3 ...
Page 46: ...Markers Field Menu Map Continued The Marker Menu 5 4 ...
Page 65: ...6 The Trigger Menu ...
Page 67: ...Trigger Field Menu Map The Trigger Menu 6 3 ...
Page 84: ...6 20 ...
Page 85: ...7 The Display Menu ...
Page 87: ...Display Field Menu Map The Display Menu 7 3 ...
Page 94: ...7 10 ...
Page 95: ...8 The Auto Measure Menu ...
Page 97: ...Auto Measure Menu Map The Auto Measure Menu 8 3 ...
Page 105: ...9 The Waveform Selection Menu ...
Page 107: ...Waveform Selection Menu Map The Waveform Selection Menu 9 3 ...
Page 116: ...9 12 ...
Page 117: ...10 Specifications and Characteristics ...
Page 125: ...11 Installation and Operator s Service ...
Page 140: ...11 16 ...
Page 148: ...Glossary 4 ...