4 CALIBRATION
53
The screen shows that the calibration is complete.
9.
Press [YES].
The conductivity span calibration coefficient is updated.
10.
Close the valve of the calibration tank.
11.
Open the sample water feed valve.
12.
Adjust the flow rate of the sample water to 80 mL/min using the valve.
13.
Disconnect the calibration tank from the calibration inlet of the device.
Summary of Contents for TW-100
Page 1: ...Water Distribution Monitor TW 100 Instruction Manual CODE GZ0000080187H ...
Page 8: ......
Page 174: ......