2 PREPARATION
9
2.3
Installing the Conductivity Sensor (optional)
1.
Make sure that the sample water feed valve is closed and the power is OFF.
2.
Loosen the screws and remove the cover.
3.
Remove the cap from the conductivity sensor.
Note
Be careful not to lose the protective cap, as it will be used to store the sensor.
4.
Install the conductivity sensor to the electric conductivity sensor’s installation
position in the residual-chlorine/conductivity cell.
5.
Connect the sensor connector.
6.
Attach the cover and tighten the screws.
Screw
Cover
Conductivity sensor connector
Enlarged
Conductivity sensor
Installation position
Sample water feed valve
must be closed.
view
Summary of Contents for TW-100
Page 1: ...Water Distribution Monitor TW 100 Instruction Manual CODE GZ0000080187H ...
Page 8: ......
Page 174: ......