
3 OPERATION
12
5.
Turn ON the power.
Wait a while until the screen turns displays the MEASUREMENT screen.
“WARM UP!” is displayed until the temperature of the turbidity/color cell becomes stable
(approximately 20 minutes).
6.
Adjust the clock.
Reference
"5.6 Clock Adjustment" (page 88)
7.
Change the settings as needed.
Reference
8.
Calibrate the values.
Note
When starting the device or after replacing a sensor, operate the device for at least two hours using
sample water until the sensor becomes stable, then perform calibration.
Reference
When the start-up procedure is complete, measurement begins.
“WARM UP!” is displayed.
Summary of Contents for TW-100
Page 1: ...Water Distribution Monitor TW 100 Instruction Manual CODE GZ0000080187H ...
Page 8: ......
Page 174: ......