67
Section 3 - Operation
4.
Slowly open the source valve to begin filling the
tank.
5. Open the drain valve on the passenger side of the
tank for several seconds to flush out debris that
may have accumulated on the bottom of the tank,
then close the valve.
6.
Monitor the tank sight glass closely during fill
operations and close the source valve just before
the tank is completely filled.
7.
Close the water tank fill valve, release the cam-
locks and disconnect the fill hose from the fitting.
Clean Water Tank Sight Gauge
Clean Water Tank Drain Valve
8.
Remove the fill hose from the water source and
drain the hose.
9. Store the hose in a clean, safe location.
CAUTION
OPERATORS MUST ALWAYS MONITOR THE TANK CLOSELY
DURING FILLING OPERATIONS AS THE FLOW OF WATER
FROM A HYDRANT OR OTHER HIGH VOLUME SOURCE
CAN BE FAR GREATER THAN THE FLOW CAPACITY OF THE
TANK AIR VENT. OVERFILLING WILL CAUSE EXCESSIVE
PRESSURE AND DAMAGE TO THE TANK.
Summary of Contents for SK5500
Page 2: ......
Page 80: ...80 NOTES...
Page 135: ...135 Section 5 Scheduled Maintenance Hog Technologies...
Page 141: ...141 Appendix 2 Tools Spare Parts...
Page 142: ...142 Appendix 2 Tools Spare Parts...
Page 143: ...143 Appendix 3 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM...
Page 152: ...152 NOTES...
Page 159: ......
Page 160: ......