93
Section 4 - General Maintenance
9. Install the nozzles into the spray bar being
careful not to get any anti-sieze on the seat
area of the nozzle or the spray bar.
10.
Tighten each nozzle finger tight, then torque
to 10 ft lbs.
11. Reactivate the truck and water blasting sys-
tem by following the steps in the Start Up
Procedure.
12. Set the Head Rotation speed dial to 0, then
follow the procedure to activate the ultra-high
pressure water system.
13. Make sure all personnel are well clear of the
blasting head, then press the DUMP VALVE
switch to activate the high pressure system
and set the operating pressure to a safe level.
Staying well clear of the water jets, no closer
than 18”, visually inspect the spray pattern of
each nozzle.
14.
Confirm at least a 1 inch, needle tight, water
jet is coming from each nozzle.
15. Deactivate the water blasting system and
place the truck in the service position.
16. Install the spray bar protective cover and
gasket.
Nozzle Pressure Test - All Nozzles Good
Typical Spray Bar & Nozzle
Summary of Contents for SK5500
Page 2: ......
Page 80: ...80 NOTES...
Page 135: ...135 Section 5 Scheduled Maintenance Hog Technologies...
Page 141: ...141 Appendix 2 Tools Spare Parts...
Page 142: ...142 Appendix 2 Tools Spare Parts...
Page 143: ...143 Appendix 3 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM...
Page 152: ...152 NOTES...
Page 159: ......
Page 160: ......