117
Section 5 - Scheduled Maintenance
Carbide Ring
Packing
Stuffing Box, Gland Nut, Packing & Plunger
Plunger
Guide Bushing or Carbide Ring
9. Check the plunger for scoring and wear. Polish
or replace if necessary.
10. Reinstall the guide bushing in the gland nut
and apply a thin coat of anti-seize to the gland
nut threads. Make sure not to get any anti-
seize on the guide bushing.
11. Insert the plunger fully into the gland nut. Be
careful to not dislodge the guide bushing.
12. Install new packing onto the plunger. Push it
tight against the guide bushing.
13. Carefully install the plunger, packing and gland
nut assembly into the stuffing box
14. Hand tighten the gland nut. Then insert the
Jetstream Tool into the gland nut and hit the
tool three times with the hammer in a clock-
wise direction to tighten.
Summary of Contents for SK5500
Page 2: ......
Page 80: ...80 NOTES...
Page 135: ...135 Section 5 Scheduled Maintenance Hog Technologies...
Page 141: ...141 Appendix 2 Tools Spare Parts...
Page 142: ...142 Appendix 2 Tools Spare Parts...
Page 143: ...143 Appendix 3 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM...
Page 152: ...152 NOTES...
Page 159: ......
Page 160: ......