Contents
1.1.2 Installation of the unit
1.2.3 Attaching the mounting brackets
1.3 Connection to the power supply
CE50-10 Names and Functions of Parts
2.1 Indicators and controls on the unit
2.1.3 Test mode switch (AUTO, TEST)
2.1.4 LAN connectors (LAN0, LAN1, LAN2)
2.1.5 Main power switch (MAIN POWER)
2.1.6 RAS indicator (AP, E3, E2, E1)
2.1.10 TEST STATUS lamp (TEST)
2.1.11 LAN SPEED lamp (LAN0, LAN1, or LAN2)
2.1.12 LAN LINK/ACT lamp (LAN0, LAN1, or LAN2)
2.1.13 DisplayPort connectors (DISPLAY1 and DISPLAY2)
2.1.14 External Contact connector (EXT)
2.1.15 USB 3.0 ports (USB1 and USB2)
Operating the Power Supply of the CE50-10
3.1.1 Before turning on the power
3.2 Turning on the power to the CE50-10
3.3 Turning off the power to the CE50-10
3.3.2 Turning off the power to the CE50-10
i
Summary of Contents for CE50-10
Page 1: ...Hitachi Industrial Edge Computer CE50 10 Instruction Manual CC 65 0171 ...
Page 10: ......
Page 23: ...Figure 1 6 Attaching mounting brackets 4 1 Installing the CE50 10 7 ...
Page 26: ......
Page 38: ......
Page 42: ...4 2 5 Connection diagram Figure 4 2 Connection diagram 4 External Contact Functions 26 ...
Page 44: ......
Page 87: ... sudo etc init d netfilter persistent save 5 Configuring Software Environment 71 ...
Page 117: ...version information 13 Log out from the unit exit 5 Configuring Software Environment 101 ...
Page 148: ......
Page 149: ...7 Maintaining the CE50 10 This chapter describes maintenance of the CE50 10 133 ...
Page 157: ...8 Troubleshooting This chapter describes troubleshooting of the CE50 10 141 ...
Page 162: ...8 1 14 Cannot turn off the power to the unit Please contact us 8 Troubleshooting 146 ...